Alpine School District-Greenwood Elementary School

The original Greenwood Elementary School Located in American Fork, Utah was constructed in 1956 with various remodels and additions over the years and needed to be rebuilt to bring it up to current code standards as well as address the current educational needs of the students. CMA was hired to work with the Alpine School District to design a Phased Rebuild, that would allow the students to remain on site throughout the construction of the new school. The School District also wanted to keep a portion of the building that had recently been added to the school and was still in good condition. The design solution saved approximately 20,000 square feet of the existing school and created 61,800 sq. ft. of new construction. It relocated the entry and provided the school with a new presence on the street front, as well as incorporated a new “Secure Entry.”

21st century learning opportunities were also an important part of the new school design. Working with the owner, CMA was able to incorporate collaborative work areas, a state of the art Maker Space, and small and large group break-out spaces. These spaces provide flexible project based learning environments that address the changing needs of today’s students.

  • Date : August 2020
  • Client : Alpine School District
  • Size : 81,800 S.F.
  • Location : American Fork, Utah
  • /
© 2019 Curtis Miner Architecture. All Rights Reserved.